欧美人妻精品一区二区三区,无码精品AV久久久免费,欧美激性欧美激情在线,麻豆成人久久精品二区三区

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://m.perthama.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

鋼筋加工棚的8點(diǎn)安裝事項(xiàng)

來(lái)源:http://m.perthama.com/   發(fā)布時(shí)間:2023-02-17

鋼筋加工棚是施工現(xiàn)場(chǎng)鋼筋調(diào)直、彎曲和焊接的場(chǎng)所。鋼筋加工棚我們來(lái)看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對(duì)接,(不要擰14個(gè)螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個(gè)螺絲)。否則,支架的孔沒(méi)有對(duì)齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個(gè)螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車(chē)或吊車(chē)將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時(shí),確保立柱的腰線在中間3米。方管柱底盤(pán)通過(guò)20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個(gè)2.99米鉆尾,鋼筋加工棚4個(gè)2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過(guò)鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來(lái)放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://m.perthama.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://m.perthama.com consulting service

精品久久久久成人码免费动漫| 中文字幕丰满孑伦无码精品 | 日本137肉体摄影| 九九久久精品无码专区| 扒开双腿疯狂进出爽爽爽动态照片| 无码免费人妻A片AAA毛片| SM调教论坛一区| 夜夜被公侵犯的美人妻| 无码少妇一区二区三区芒果 | 亚洲AV无码国产综合专区| 国产毛片精品一区二区色欲| 丰满熟妇无码久久精品国产| 天天摸日日摸狠狠添高潮喷| 亚洲中文字幕无码一久久区 | 50岁退休熟女露脸高潮| 亚洲AⅤ在线无码播放毛片一线天| 亚洲精品一区二区三区四区五区| 久久国产乱子伦精品免费女| 日本丰满熟妇BBXBBXHD| 婷婷成人亚洲综合国产| 小雪的13又嫩又紧又多水带图| 久久久久欧美精品观看 | 精品国产乱码久久久久久| 掀开奶罩边躁狠狠躁软学生电影| 亚洲AV片不卡无码久久| 先锋影音人妻啪啪VA资源网站| 日韩AV无码久久一区二区| 再深点灬舒服灬太大了嗯| 亚洲中文久久精品无码WW16| 苍井空亚洲精品AA片在线播放 | 上司人妻互换HD无码中文字幕 | 久久久久亚洲AV成人人电影| 成人片色情免费观看网站| 人善交ZZZZXXXXX另类| 国产超碰人人模人人爽人人添| 一区二区三区精华液| 换着玩人妻hd中文字幕| 精精国产xxxx视频在线| 色狠狠色噜噜AV天堂五区| 人妻少妇看A偷人无码 | 亚洲AV无码有乱码在线观看|